Progressive Billing and Retention

Build clear billing sections

Put every line item in the section where that work will be earned. The section subtotal gives the billing ceiling for that part of the scope, while its retention term controls what is held back from draws against it. The example below uses a 5% bid-level retention and a 3% override for Cabinetry. Expand a section to see its items, and notice how Cabinetry’s header reads differently from the other two.

  1. Click the Demo & Preparation header to collapse it.
  2. Review the Cabinetry section and confirm its 3% retention override.
  3. Review Finish Work and confirm it carries the bid-level 5% retention.
Kitchen Remodel, progressive billing schedule
Section / itemQuantityAmount
Demo & Preparation, 5% retention$3,650.00
Kitchen demolition1 allowance$2,750.00
Dust and floor protection1 allowance$900.00
Cabinetry, 3% retention override$13,850.00
Base and wall cabinets1 allowance$8,400.00
Island cabinet package1 allowance$2,200.00
Cabinet installation65 linear ft$3,250.00
Finish Work, 5% retention$7,100.00
Quartz countertop installation30 sq ft$1,800.00
Tile backsplash29 sq ft$1,450.00
Electrical finish1 allowance$2,100.00
Plumbing finish1 allowance$1,750.00