The calendar header shows the current period with Today, back, and forward controls. Month view shows six weeks at a time, including padding days from the previous and next month; clicking a day drills into day view for that date. Each job appears as a compact chip on its scheduled date, colored by status, with the scheduled time and a truncated title; click any chip to open the full job. Recurring schedules project future occurrences onto the calendar the same way, but with a dashed border and a small repeat glyph, and they link back to the schedule template instead of a generated job. A material order or delivery shows as its own amber or blue chip on the day it’s due, separate from any job chip on that same date.
- Click June 15 to review a day with two scheduled jobs.
- Click the Kitchen remodel kickoff chip to open that job.
- Click June 12 to review the weekly pool-service visit.
- The dashed amber chip on June 18 is a material delivery, not a job.
- Click the right arrow to preview July.
| Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|
| Jun 8 HVAC maintenance |
Jun 9 | Jun 10 Electrical panel upgrade |
Jun 11 | Jun 12 Weekly pool service (recurring) |
Jun 13 | Jun 14 |
| Jun 15 Kitchen remodel kickoff Bathroom leak repair |
Jun 16 | Jun 17 | Jun 18 Fence installation Delivery: Fence panels |
Jun 19 Weekly pool service (recurring) |
Jun 20 | Jun 21 |