The calendar header shows the current period with Today, back, and forward controls. Month view shows six weeks at a time, including padding days from the previous and next month; clicking a day drills into day view for that date. Each job appears as a compact chip on its scheduled date, colored by status, with the scheduled time and a truncated title; click any chip to open the full job. Recurring schedules project future occurrences onto the calendar the same way, but with a dashed border and a small repeat glyph, and they link back to the schedule template instead of a generated job. A material order or delivery shows as its own amber or blue chip on the day it’s due, separate from any job chip on that same date.

  1. Click June 15 to review a day with two scheduled jobs.
  2. Click the Kitchen remodel kickoff chip to open that job.
  3. Click June 12 to review the weekly pool-service visit.
  4. The dashed amber chip on June 18 is a material delivery, not a job.
  5. Click the right arrow to preview July.
MonTueWedThuFriSatSun
Jun 8
HVAC maintenance
Jun 9 Jun 10
Electrical panel upgrade
Jun 11 Jun 12
Weekly pool service (recurring)
Jun 13 Jun 14
Jun 15
Kitchen remodel kickoff
Bathroom leak repair
Jun 16 Jun 17 Jun 18
Fence installation
Delivery: Fence panels
Jun 19
Weekly pool service (recurring)
Jun 20 Jun 21